QB 4.97 - 07 Generating Contracts (Schedule of Values)

Reference Number: AA-01835 Views: 2297 Created: 12/18/2017 09:29 am Last Updated: 04/03/2018 03:57 pm 0 Rating/ Voters

To generate a (billing) Contract, click on the Schedule of Values Tab. (It's a good idea to close the Bid Navigator when using the Schedule of Values Tab, just to maximize your working space.)

When you click on this Tab, if there is not an existing Contract, the first thing you will want to do is create one.

Click the New Contract button and then fill in the information for the new contract.

You will name the Contract and select which Costs from the Base Bid, Accepted Alternates (if any), and Accepted Change Orders (if any) to include. Once a Bid or Child Bid is included in a Contract, it cannot be included in another Contract.

You will also choose to use Cost Code Type (Material, Labor, Equipment, etc.) or Cost Code Description for the Contract (examples below).


Shown by Cost Code Type


Shown by Cost Code Description

Click Show Detail View to see a breakdown of the costs in the SOV Summary panel. From the details, you can change the Description of Work for each Cost Code (or Cost Code Description, if that's how you've chosen to setup your contract).

When you select "Cost Code Type" your bid Costs are allocated to "Labor", "Material", "Equipment", "Other", "Subcontractor", "Tax" (all Labor Burdens, combined), and "AM" (Additional Markup), by default - you can adjust these in the Details section.

You can assign Description by Section, Area, or Size/Style by checking the appropriate option. We've selected "Areas" in the screenshot below.

When you select Section, Area, or Size/Style, you can set the "Description of Work" even more granularly.

As you change the "Description of Work' in the details grid, your SOV Summary (upper grid) updates:

You change the Description of Work in the lower grid to affect how costs are "rolled up" in the upper grid.

In the upper grid, you modify the Overhead and Profit percentages, or plug-in values. You can edit the values in any of the blue columns (Overhead %, Profit %, OHand P %, and % Contract) and the "Total Price" column. Changing one updates the others, as needed. As you modify percentages, you will notice that your "Variance" will change. The "Variance" is how far from the actual Total Bid Amount this contract is. Ideally, you want to get your Variance to "0", or very close, so your Contract (billing) matches your estimate.

When you are looking at the "Totals" row in the upper grid, keep in mind that the Adjusted Overhead %, Profit %, and OHand P% columns are not summations or averages of the information in the column These are calculated by dividing the Overhead, Profit, or Oand H amount by the Job Cost Total.

Generating The Contract

Click the Generate button toward the top of the SOV Tab.

Click the Check box if you want to see Details in the Contract.


Not Detailed Contract


Detailed Contract

From this screen, you can print or export the Contract. See previous articles for details on printing/exporting Reports.

previous article arrow Adding a Company Logo to a Proposal Bid, Labor, and Material Exports next article arrow


Discussion
  • There is no feedback for this article.
Info kBase Article Feedback

If you need Technical Support or want to submit a Feature Request, click one of the buttons below, do not use this form.

 
request support Request Support submit feature request Feature Request

 

How Does This Article Not Measure Up?

Your full name: Your Email: Your feedback on this article:

 

Something Wrong with this Article? Let us Know! Copyright 2018 - On Center Software, Inc. All Rights Reserved.
Be sure to rate this article 5 stars if you found it helpful!.